September 21, 2020

The Persian Gulf, a prosperous oasis for Spanish industry


Madrid

Updated:

save

The development of hydrocarbons in the Persian Gulf from the eighties, after the world oil crisis in 1973, led to the landing in this region of several Spanish companies that, since then, have built all kinds of industrial plants.

For example, Gathered techniques was awarded in 2017 the execution of a turnkey contract at the Ras Tanura refinery, on the east coast of Saudi Arabia. Also a gas plant in the same country, by Saudi Aramco, the world’s largest oil company, for almost 4,000 million euros. That same year, it modernized the Oman refinery, a project valued at 2.33 billion euros.

In 2015, the KNPC company awarded this Spanish group the construction of the fifth gas liquefaction train in al-Ahmadi (Kuwait) for 1,200 million euros. In this country, it modernized the Al Zour refinery for 3,500 million euros. And at the end of 2018, Técnicas Reunidas was awarded several power generation and petrochemical contracts in the United Arab Emirates for a combined value close to 900 million.

For 35 years

For its part, Assembled Pipes opened a commercial office in Dubai in 2013, although it has been present in the area for more than 35 years. In addition to drilling pipes for oil and gas, as well as pipelines and for projects of new chemical and petrochemical complexes and refineries, there is a growing demand in these countries for seamless tubes destined for new electricity generation plants and goods. of equipment in general.

The multinational Actuate established its first Middle East office in Dubai in 2008. In addition to building the city’s metro and expanding the huge desalination plant in the emirate of Fujairah, the group chaired by José Manuel Entrecanales inaugurated a new global center in Dubai at the end of last year. 3d print.

The new facilities house the largest operational 3D printer in the world of technology known as Powder Bed, especially indicated to generate pieces of high structural resistance, and that works with concrete as raw material, which makes it an ideal solution for your use in architecture, urban planning and building. The choice of this city was not accidental, since local regulations foresee that all new buildings in the city must include 25% of the project carried out through 3D printing by 2025.

Desalination plants

Likewise, Acciona has been awarded several water facilities in the United Arab Emirates, located in Dubai and Fujairah, such as the Fujairah 1 desalination plant using reverse osmosis technology, with a capacity of 136,000 m3 / day and the one in Dubai, 181,000m3 / day.

Ferrovial built section 5 of the Batinah highway, in the north of the country. The work consisted of the layout of 41 kilometers of road, four lanes in each direction, between the towns of Liwa and Sohar, on the north coast of Oman. The highway provides an important economic boost to Oman by connecting Muscat, the country’s capital, with the border with the United Arab Emirates.

This company was also awarded the construction of a desalination plant in the emirate of Ajman.

On the other hand, the group FCC was awarded two major contracts in Abu Dhabi for the operation and maintenance of the capital’s sanitation system, as well as the adjacent islands Al Reem, Al Maryah and Al Saadiyat. The Spanish group manages 1,320 kilometers of networks, as well as 54 wastewater pumping stations that, in total, drive more than 100,000 million liters per year.

See them
comments

.



Source link